
Add to Cart
Cardboard Folding Pasting Carton Box Gluing Making Glue Machine Folder Gluer
Introduction |
Automatic folder & gluer consist of three parts which feeding part, gluing folding part, counting and piling part.
Digital display adjust speed, microcomputer adjust width, with easy, fast, stable, precision, automatically feed,
fold and glue, count, pill and output. Average speed: 150sheets/min, Max speed: 220sheets/min, high efficiency
energy save.
Parameters |
Model | FG2600 | FG2800 | FG3000 | |
A
| Max | 880mm | 880mm | 880mm |
Min | 80mm | 80mm | 80mm | |
B
| Max | 2400mm | 2600mm | 2800mm |
Min | 700mm | 700mm | 700mm | |
C
| Max | 840mm | 840mm | 840mm |
Min | 160mm | 160mm | 160mm | |
D
| Max | 1200mm | 1200mm | 1200mm |
Min | 300mm | 300mm | 300mm |
Detailed Images |
![]() | Paper Feeding Adjustment:
1. Adjust the width of the feeding board
2. Adjust the length of the paperboard
3. Adjust the thickness of the paperboard
4.Paper feeding belt adjustment mechanism |
Gluing and Folding Adjustment:1) Adjust the height of the upper pressing wheel 2) Diaphragm pump automatically circulates glue 3) Adjust the amount of glue 4) Glue box | ![]() |
![]() | Counter and stacker section:1: Stacking and counting are simple and reliable. 2: Digital control, operation easily and reliable, No-stop put in data and automatic counting. 3: With rectification function. 4: Paperboard counting and put out by pneumatic, stable and quickly. |
Maintenance:
1. The equipment is used within the maximum adjustment range, and all transmission handles, hand wheels,
and screw rods should be kept flexible and lubricated.
2. Regularly check the tight positions of the transmission gears, sprockets, pulleys, etc. and the tension of each spring.
3. All conveyor belts should be kept clean, and a small amount of low-concentration detergent can be used to wipe.
4. The rubber wheel must be cleaned after each shift to prevent the glue from drying out and affecting normal work.
5. Lubricating oil must be added to the chain drive part in each shift, and lubricating oil should be added to the connecting bearing every two months.
Before starting the equipment, make sure that all parts are correct and operate normally before operation.
Equipment Installation and Power Distribution:
1. The installation requires a 15×5×3 m space site. For the convenience of operation and production, the space on
both sides should be more than 1 meter away from the wall, the ground is level, and the working surface of the
equipment is adjusted horizontally.
2. This equipment uses 380V (440V) AC power supply, and the power supply directly intervenes at the input end of the distribution box. Refer to the schematic diagram for details.
3. Before commissioning the equipment, make sure that all parts are installed and connected correctly, that there is
no foreign matter on the chain and belt, and can only operate after normal operation.
Note: The internal parameters of the microcomputer have been set and locked, please do not tamper with it without authorization, which may result in malfunction.
Packing and Shipping |
Adopts moisture-proof and shock-proof packaging which is suitable for long-distance road
transportation and various types of weather conditions. A full set of maintenance and operation
manuals is included.
![]() |
Our Services |
Q: 1.Are you a manufacturer, trading company or a third party? A: We are a manufacturer, [Cangzhou Shengchuan Machinery Manufacturing Co.,Ltd] located in Xiaoxing Industrial zone,south of Dongguang county, Hebei province, China. Warmly welcome to visit our company. Q: 2. What is your minimum order quantity, can you send me samples? A: Our minimum quantity is 1 set, as our product is machinery equipment, it’s difficult to send you samples, if you have any questions about the products, please feel free to contact us for more detail, we are glad to provide you more information such as specifications, video, etc. Q: 3. How does your factory do regarding quality controlling? A: (1) All raw material we used are environmental-friendly. (2) Skillful workers care every details in handling the producing and packing process. (3) Quality control department are specially responsible for quality in each process. We have been kept providing high quality products by introducing advanced technologies for over 20 years, and our products are also widely exported to many different countries including Russia, the Middle East, Africa, Southeast Asia, EU, etc, which earned us a high reputation among the customers. Q: 4.What is the delivery time of your machine? A: In general, the delivery time of our machine is about 30 days, customized machine will be delivered as the negotiation with our clients. Q: 5.How about the after-sale service? A: (1) TM online for 24 hours, also contact by email, skype, MSN, whatsapp, etc. (2) To solve the problems with videos/pictures. (3) One year warranty for spare parts change. |
Factory |